Overcoming Rail Rake Constraints with Dedicated Road Haulage
While Indian Railways rakes (BOXN/BOBR wagons) transport enormous volumes, their rigid allotment cycles, mandatory full-rake commitments (approx. 3,800 to 4,000 metric tons per rake), and demurrage penalties create severe liquidity and scheduling bottlenecks for medium-to-large industrial consumers.
Road haulage via high-capacity 20 to 40-ton multi-axle tippers bridges this critical gap. Road transport permits tailored daily deliveries, allowing continuous boiler feed without immobilizing working capital in massive on-site coal stockpiles.
